Your course

Pick up where you left off.

Current Status

Not Enrolled

Price

$99.00

Get Started

Course Content

I. Introduction (2 minutes)
II. Learning Objectives (1 minute)
III. Module 1: Who the Act Covers (11 minutes)
IV. Module 2: Reference Dates and Payment Claims (11 minutes)
V. Module 3: Payment Schedules and the Cost of Silence (11 minutes)
VI. Module 4: Adjudication and Enforcement (11 minutes)
VII. Case Studies (4 minutes)
VIII. Summary and Key Takeaways (2 minutes)
For builders, trades, designers and architects on Tasmanian work

Security of Payment in Tasmania

An invoice that does not say it is made under the Act starts no clock at all.

Payment claims and adjudication under the Building and Construction Industry Security of Payment Act 2009 (Tas), as at November 2026. Test whether a contract, a claimant and a respondent fall within the Act, prepare a valid payment claim, answer one with a payment schedule inside the ten or twenty business day limit, and follow adjudication from the three gateways to the certificate, judgment and suspension.

60 minutes, self-paced Intermediate level 1 formal CPD point Certificate on completion Tasmania, as at November 2026
Aligned to NSCA 2021 PC1 PC5 PC14 PC52 PC57
$99 inc. GST, one-off
  • Product neutral, no supplier content
  • Audio version and glossary included
  • Certificate saved to your dashboard

Secure card checkout. Tax invoice emailed.

Course content

4 modules, 2 case studies, final quiz and certificate.

Start 3 min

Introduction and objectives

How the Act reaches builders, trades, suppliers and designers from both sides, the three patterns behind most losses, and the four objectives.

Module 1 11 min

Who the Act Covers

Written and oral contracts, work, goods and services including design, what sits outside the Act, the residential owner, and the bans on contracting out and pay when paid.

Module 2 11 min

Reference Dates and Payment Claims

The right on each reference date, valuing the claim, the seven things a valid claim contains, one claim per reference date, the twelve month limit and service.

Module 3 11 min

Payment Schedules and the Cost of Silence

What a schedule must say, the ten or twenty business day limit, the claimed amount as a debt, an unpaid schedule, suspension and the lien on unfixed materials.

Module 4 11 min

Adjudication and Enforcement

Three gateways and their deadlines, nominating authorities, the response and the reasons rule, the determination, the adjudication certificate and judgment.

Case studies 4 min

The Launceston design fee and the Hobart payment schedule

A design fee sent as an ordinary invoice, and a one line payment schedule that lost a delay backcharge in adjudication.

Summary 2 min

Key takeaways

The dates and sentences to carry into your next payment claim or payment schedule.

Finish

Final quiz and certificate

Ten scenario questions. Pass and the certificate goes straight into your dashboard.

Intermediate. For practitioners who claim progress payments or answer them on Tasmanian building work. Reflects the Building and Construction Industry Security of Payment Act 2009 in the version from 1 July 2025, as checked on 11 November 2026; no regulations under the Act were located when checked. General professional education, not legal advice: have your contracts, payment claims, payment schedules and any adjudication strategy reviewed by your own lawyer, and check the current position with Building Standards Tasmania.

Who it is for

Written for the people who claim progress payments and the people who answer them.

Builder

You are the claimant against the owner and the respondent when a subcontractor claims from you, often on the same job.

1 CPD point

Building Designer

Design services are construction related services under the Act, so an unpaid fee can be claimed, if the claim says it is made under the Act.

1 formal CPD point

Architect

You can recover a fee under the Act, and be on the receiving end when you contract out drafting, engineering or surveying.

1 formal CPD point

Construction Manager

You receive the claims, record the service dates and write the schedules an adjudicator will read.

1 CPD point

Practice Manager

You own the claim template, the register of service dates and the diary that keeps every deadline.

1 CPD point
How it counts

Where this hour goes on your record.

National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:

PC1

Regulatory obligations and professional conduct

PC5

Client architect agreements

PC14

Construction administration systems

PC52

Construction contract principles and mechanisms

PC57

Progress claims, variations and extensions of time

If you are

How it is recorded

An architect

1 formal CPD point. Aligned with NSCA 2021 performance criteria PC1, PC5, PC14, PC52 and PC57.

A building designer

1 formal CPD point. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard, so you can show what you studied if your CPD is audited.

A builder, construction manager or practice manager

1 hour of CPD on security of payment, payment claims and adjudication in Tasmania, recorded on your certificate for your licensing body.

CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.

  • Examine whether a contract, a claimant and a respondent fall within the Tasmanian Act.
  • Identify when an owner building a home has twenty business days, and when a building practitioner has ten.
  • Apply the reference date, valuation and content rules to prepare a valid payment claim.
  • Evaluate a payment schedule against what the Act requires it to say and when it must arrive.
  • Identify the consequences of giving no schedule in time, or not paying a scheduled amount.
  • Analyse the adjudication pathway from the three gateways to the certificate, judgment and suspension.
Keep going

Pairs well with.

Business

The Residential Building Work Contracts and Dispute Resolution Act 2016 (Tas) Explained

Scope, contracts, deposits, progress payments and disputes on Tasmanian homes.

Business

Statutory Warranties and Defect Liability in Tasmania

The warranties, time limits and defect duties on Tasmanian residential work.

Architects

How Do I Get Paid for the Extra Work the Client Keeps Asking For?

Scope change and written instructions on the design side.

Questions

Before you enrol.

No. The coverage rules, business day limits and adjudication steps are taught for the Tasmanian Act as checked in November 2026; every other state and territory has its own security of payment legislation with different deadlines.

Start, stop and finish later. Progress is saved and the course stays in your dashboard.

Yes, on passing the final quiz. It is stored in your dashboard alongside your other CPD records.

Yes. Architectural, design, engineering and surveying services are construction related services under the Act, and the first case study follows a building designer’s unpaid fee.

Yes. Team packs start at $579 for six courses shared across your practice.

No. Every course is product neutral. No nominating authority, firm, product or standard form contract is named, and there is no sales pitch at the end.

Send your next payment claim, or answer one, with the right sentence on the page and the right date in the diary, in one self-paced hour.

$99, 60 minutes, certificate on completion.

$99 1 hour, certificate