Your course

Pick up where you left off.

Current Status

Not Enrolled

Price

$99.00

Get Started

Course Content

I. Introduction (2 minutes)
II. Learning Objectives (1 minute)
III. Module 1: The Warranties the Act Implies (11 minutes)
IV. Module 2: How Long the Exposure Lasts (11 minutes)
VII. Case Studies (4 minutes)
VIII. Summary and Key Takeaways (2 minutes)
Final Quiz – Statutory Warranties and Defect Liability in Tasmania
For builders, building designers and architects on Tasmanian homes

Statutory Warranties and Defect Liability in Tasmania

A house you hand over today can still be claimed against in 2032, by an owner you never met.

Statutory warranties in Tasmania and the defect liability around them, for residential work as at November 2026. Identify which of the seven warranties apply and who holds them, test whether a claim is still open against the six year warranty period, the Limitation Act and the Building Act’s ten year ceiling, meet the Building Act duties to notify and rectify defective work, and see how proportionate liability and the insurance position decide who pays.

60 minutes, self-paced Intermediate level 1 formal CPD point Certificate on completion Tasmania, as at November 2026
Aligned to NSCA 2021 PC1 PC16 PC46 PC55 PC56
$99 inc. GST, one-off
  • Product neutral, no supplier content
  • Audio version and glossary included
  • Certificate saved to your dashboard

Secure card checkout. Tax invoice emailed.

Course content

4 modules, 2 case studies, final quiz and certificate.

Start 3 min

Introduction and objectives

How the warranties reach builders and designers, the three patterns behind most defect disputes, and the four objectives.

Module 1 11 min

The Warranties the Act Implies

Materials, legal compliance and care and skill, the plans, occupation, diligence and allowance warranties, later owners and owner builders, void waivers and the written advice defence.

Module 2 11 min

How Long the Exposure Lasts

Six years from practical completion, substitute dates when completion cannot be proved, the Limitation Act periods, the section 327 ceiling and defects liability periods.

Module 3 11 min

Building Act Duties and the Rectification Route

What the designer must deliver and the builder must ensure, the duty to notify defective work, the two year rectification duty, the defective work order and the path to the Tribunal.

Module 4 11 min

Shared Liability, Insurance and Practice Risk

Negligence in outline, Part 9A proportionate liability, the Tasmanian position on home warranty insurance, and the records and defect replies that hold up.

Case studies 4 min

The Launceston shower and the Hobart retaining wall

A shower that leaked after the house was sold, and a boundary retaining wall noted to engineer’s detail with no engineer engaged.

Summary 2 min

Key takeaways

The checks to carry into your next Tasmanian handover and defect report.

Finish

Final quiz and certificate

Ten scenario questions. Pass and the certificate goes straight into your dashboard.

Intermediate. For practitioners who build, document or administer residential building work in Tasmania; how a regulated contract is formed is recapped only briefly. Reflects the Residential Building Work Contracts and Dispute Resolution Act 2016, the Building Act 2016, the Limitation Act 1974 and the Civil Liability Act 2002, as checked on 11 November 2026. General professional education, not legal or insurance advice: have your contracts, any limitation question and your insurance cover reviewed by your own lawyer and broker, and check the current position with Building Standards Tasmania.

Who it is for

Written for the people who build, document and answer for Tasmanian homes after handover.

Builder

You give the seven warranties, carry the Building Act duties to notify and rectify, and answer to later owners for years.

1 CPD point

Building Designer

Your documents become the measure of the builder’s work, and sections 43 and 44 of the Building Act set the standard they are judged against.

1 formal CPD point

Architect

You document the work and often administer the contract, so every owner override of your advice needs to be in writing.

1 formal CPD point

Construction Manager

You keep the concealed work photographs, the handover file and the defect replies a mediator or the Tribunal will read.

1 CPD point

Practice Manager

You own the client instruction form, the project file and the ten year record keeping that decide your share of a claim.

1 CPD point
How it counts

Where this hour goes on your record.

National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:

PC1

Regulatory obligations and professional conduct

PC16

Risk management and climate resilience

PC46

Compliant project documentation

PC55

Record keeping and document control

PC56

Defects, rectifications and substitutions

If you are

How it is recorded

An architect

1 formal CPD point. Aligned with NSCA 2021 performance criteria PC1, PC16, PC46, PC55 and PC56.

A building designer

1 formal CPD point. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard, so you can show what you studied if your CPD is audited.

A builder, construction manager or practice manager

1 hour of CPD on statutory warranties, defect liability and the Building Act defect duties in Tasmania, recorded on your certificate for your licensing body.

CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.

  • Analyse which statutory warranties apply to a Tasmanian residential contract and who can enforce them.
  • Use written advice to secure the defences the Act allows when an owner overrides you.
  • Apply the warranty period, the substitute dates and the limitation rules to decide whether a claim is still open.
  • Examine the Building Act duties of designers and builders, including the duty to notify defective work.
  • Identify when a defective work order can issue and how a defect reaches the Tribunal.
  • Evaluate how negligence, proportionate liability and the insurance position shape your share of a defect.
Keep going

Pairs well with.

Business

The Residential Building Work Contracts and Dispute Resolution Act 2016 (Tas) Explained

Scope, contracts, deposits, variations and disputes under the same Act.

Business

Contracts & Risk Management for Architects and Designers

Contract and risk management across your practice.

Architects

How Do I Get Paid for the Extra Work the Client Keeps Asking For?

Scope change and written instructions on the design side.

Questions

Before you enrol.

No. The warranties, time limits, Building Act duties and proportionate liability rules are taught for Tasmanian law as checked in November 2026; other states have their own home building legislation, and most differ from Tasmania on home warranty insurance.

Start, stop and finish later. Progress is saved and the course stays in your dashboard.

Yes, on passing the final quiz. It is stored in your dashboard alongside your other CPD records.

No. Contract formation is recapped briefly; scope, contract contents, deposits, variations and the dispute pathway are covered in a separate course on the 2016 Act in the Business range.

Yes. Team packs start at $579 for six courses shared across your practice.

No. Every course is product neutral. No insurer, manufacturer, product or standard form contract is named, and there is no sales pitch at the end.

Hand over your next Tasmanian home with a file that can still answer a defect claim years later, in one self-paced hour.

$99, 60 minutes, certificate on completion.

$99 1 hour, certificate