Pick up where you left off.
Course Content
Statutory Warranties and Defect Liability in Tasmania
A house you hand over today can still be claimed against in 2032, by an owner you never met.
Statutory warranties in Tasmania and the defect liability around them, for residential work as at November 2026. Identify which of the seven warranties apply and who holds them, test whether a claim is still open against the six year warranty period, the Limitation Act and the Building Act’s ten year ceiling, meet the Building Act duties to notify and rectify defective work, and see how proportionate liability and the insurance position decide who pays.
Secure card checkout. Tax invoice emailed.
4 modules, 2 case studies, final quiz and certificate.
Introduction and objectives
How the warranties reach builders and designers, the three patterns behind most defect disputes, and the four objectives.
The Warranties the Act Implies
Materials, legal compliance and care and skill, the plans, occupation, diligence and allowance warranties, later owners and owner builders, void waivers and the written advice defence.
How Long the Exposure Lasts
Six years from practical completion, substitute dates when completion cannot be proved, the Limitation Act periods, the section 327 ceiling and defects liability periods.
Building Act Duties and the Rectification Route
What the designer must deliver and the builder must ensure, the duty to notify defective work, the two year rectification duty, the defective work order and the path to the Tribunal.
Shared Liability, Insurance and Practice Risk
Negligence in outline, Part 9A proportionate liability, the Tasmanian position on home warranty insurance, and the records and defect replies that hold up.
The Launceston shower and the Hobart retaining wall
A shower that leaked after the house was sold, and a boundary retaining wall noted to engineer’s detail with no engineer engaged.
Key takeaways
The checks to carry into your next Tasmanian handover and defect report.
Final quiz and certificate
Ten scenario questions. Pass and the certificate goes straight into your dashboard.
Intermediate. For practitioners who build, document or administer residential building work in Tasmania; how a regulated contract is formed is recapped only briefly. Reflects the Residential Building Work Contracts and Dispute Resolution Act 2016, the Building Act 2016, the Limitation Act 1974 and the Civil Liability Act 2002, as checked on 11 November 2026. General professional education, not legal or insurance advice: have your contracts, any limitation question and your insurance cover reviewed by your own lawyer and broker, and check the current position with Building Standards Tasmania.
Written for the people who build, document and answer for Tasmanian homes after handover.
Builder
You give the seven warranties, carry the Building Act duties to notify and rectify, and answer to later owners for years.
Building Designer
Your documents become the measure of the builder’s work, and sections 43 and 44 of the Building Act set the standard they are judged against.
Architect
You document the work and often administer the contract, so every owner override of your advice needs to be in writing.
Construction Manager
You keep the concealed work photographs, the handover file and the defect replies a mediator or the Tribunal will read.
Practice Manager
You own the client instruction form, the project file and the ten year record keeping that decide your share of a claim.
Where this hour goes on your record.
National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:
Regulatory obligations and professional conduct
Risk management and climate resilience
Compliant project documentation
Record keeping and document control
Defects, rectifications and substitutions
| If you are | How it is recorded |
| An architect | 1 formal CPD point. Aligned with NSCA 2021 performance criteria PC1, PC16, PC46, PC55 and PC56. |
| A building designer | 1 formal CPD point. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard, so you can show what you studied if your CPD is audited. |
| A builder, construction manager or practice manager | 1 hour of CPD on statutory warranties, defect liability and the Building Act defect duties in Tasmania, recorded on your certificate for your licensing body. |
CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.
Pairs well with.
The Residential Building Work Contracts and Dispute Resolution Act 2016 (Tas) Explained
Scope, contracts, deposits, variations and disputes under the same Act.
Contracts & Risk Management for Architects and Designers
Contract and risk management across your practice.
How Do I Get Paid for the Extra Work the Client Keeps Asking For?
Scope change and written instructions on the design side.
Before you enrol.
Hand over your next Tasmanian home with a file that can still answer a defect claim years later, in one self-paced hour.