Pick up where you left off.
Course Content
Residential Building Contracts in Tasmania
Most residential disputes start with paperwork that was never done.
Residential building contracts in Tasmania under the 2016 Act and the 2026 Regulations, as at November 2026. Test whether a job is in scope, build a contract that meets section 14 and the Director’s mandatory provisions, keep deposits, progress claims and variations inside the Act, and follow a dispute from the notice to mediation and the Tribunal.
Secure card checkout. Tax invoice emailed.
4 modules, 2 case studies, final quiz and certificate.
Introduction and objectives
Who the Act reaches, the three patterns behind most disputes, and the four objectives.
When the Act Applies
Building class, the kind of work, the $20,000 line and split contracts, who the Act binds, no contracting out, and the scale of penalties.
Forming the Contract
Written, signed and copied within five business days, the section 14 contents, the Director’s mandatory provisions, prime cost items and provisional sums, the consumer guide and cooling-off.
Deposits, Progress Payments and Variations
The 5, 10 and 20 per cent deposit caps, progress payments tied to work on site, variations written before the work, and variations that need the surveyor or a permit.
Completion, Warranties and Disputes
Commencement and practical completion notices, the defects document, the statutory warranties at a glance, the notice of dispute, mediation and the Tribunal.
The Huon Valley frames and the Kingston deck
A deposit and a frame claim taken on factory-built frames, and a deck enlarged on site without a signed variation or the surveyor’s consent.
Key takeaways
The checks to carry onto your next Tasmanian residential contract.
Final quiz and certificate
Ten scenario questions. Pass and the certificate goes straight into your dashboard.
Intermediate. For practitioners who contract for, document or administer residential building work in Tasmania. Reflects the Residential Building Work Contracts and Dispute Resolution Act 2016 and the Residential Building Work Contracts and Dispute Resolution Regulations 2026, in force from 2 November 2026, and the Director’s determinations, as published in November 2026. General professional education, not legal advice: have your contract template and any dispute strategy reviewed by your own lawyer, and check the current determinations with Building Standards Tasmania.
Written for the people who sign, document and administer residential building contracts.
Builder
You sign the contract, take the deposit, claim the stages and write the variations the Act controls.
Building Designer
Your drawings and allowances become contract documents, and a design and construct package makes you the building contractor.
Architect
You document the work and often administer the contract for the owner, including every scope instruction.
Construction Manager
You run the programme, the progress claims and the completion paperwork the Tribunal will read.
Practice Manager
You own the contract template, the payment schedule and the variation form the whole team uses.
Where this hour goes on your record.
National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:
Regulatory obligations and professional conduct
Building procurement methods
Risk management and climate resilience
Progress claims, variations and extensions of time
Documentation, certification and approvals
| If you are | How it is recorded |
|---|---|
| An architect | 1 formal CPD point. Aligned with NSCA 2021 performance criteria PC1, PC9, PC16, PC57 and PC58. |
| A building designer | 1 formal CPD point. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard, so you can show what you studied if your CPD is audited. |
| A builder, construction manager or practice manager | 1 hour of CPD on residential building contracts, payments, variations and disputes in Tasmania, recorded on your certificate for your licensing body. |
CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.
Pairs well with.
Contracts & Risk Management for Architects and Designers
Contract and risk management across your practice.
How Do I Get Paid for the Extra Work the Client Keeps Asking For?
Scope change and variations on the design side.
Presenting Design Value So You Stop Competing on Price
Pricing and fee conversations with clients.
Before you enrol.
Take your next Tasmanian residential contract from enquiry to final defect with a file that answers the questions, in one self-paced hour.
$99, 60 minutes, certificate on completion.