Pick up where you left off.
Course Content
Building on Hazard Land in Tasmania
Read the band, not just the overlay. Set the floor from the level, not the rule of thumb.
Landslip, riverine flood, coastal inundation and coastal erosion, under the Tasmanian Planning Scheme and the Director’s Determinations, as at November 2026. Work out which system controls the site, apply the band requirements, find the defined flood level, and brief and document the reports your building surveyor will ask for.
Secure card checkout. Tax invoice emailed.
4 modules, 2 case studies, final quiz and certificate.
Introduction and objectives
The three mistakes that cause most delay on hazard land, and the four objectives.
Two Systems, One Map
What makes land a hazardous area, the four planning hazard codes, when the planning code steps aside, the Director’s Determinations and which code applies today.
Landslip
Reading the landslip bands, low and medium bands, medium-active, high and declared areas, significant work in the earthworks, and the landslip hazard report.
Riverine and Coastal Inundation
Riverine flooding in planning, finding the defined flood level, coastal inundation bands and the 2100 level, and the ABCB flood standard on a Tasmanian house.
Coastal Erosion and the Hazard Documentation Set
Erosion bands and mobile landforms, who prepares which report, briefing the consultant, what goes on your drawings and the approval sequence.
The Hobart garage cut and the Huonville floor
A garage cut on a medium band Hobart hillside, and a Huonville floor set to the wrong rule.
Key takeaways
The checks to carry onto your next hazard land job.
Final quiz and certificate
Ten scenario questions. Pass and the certificate goes straight into your dashboard.
Intermediate. For practitioners who already document Class 1 and Class 10 work in Tasmania. Reflects the Tasmanian Planning Scheme, the Building Act 2016, the Building Regulations 2016, the Director’s Determinations and NCC 2022 Amendment 2 as published in November 2026. Confirm the overlays, bands, levels and reports for each project with your council, your building surveyor and the relevant practitioners. General professional education, not legal, engineering or planning advice.
Written for the people who design, check, build and assess on Tasmanian hazard land.
Building Designer
You set the footings, floor levels and earthworks that the hazard bands decide.
Architect
Your Tasmanian sites carry overlays that shape the design before the first sketch.
Building Surveyor
You ask for the reports and check the levels and conditions on the drawings.
Licensed Builder
You build the cuts, fills, drainage and floors the reports allow.
Civil Engineer
You prepare the hazard reports and need a brief that asks the right questions.
Where this hour goes on your record.
National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:
Risk management and climate resilience
Planning principles and statutory planning
Integrating materials and construction systems
Coordinating specialists and consultants
Compliant project documentation
| If you are | How it is recorded |
|---|---|
| A building designer | 1 formal CPD point. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard, so you can show what you studied if your CPD is audited. |
| An architect | 1 formal CPD point. Aligned with NSCA 2021 performance criteria PC16, PC32, PC39, PC41 and PC46. |
| A building surveyor, licensed builder or civil engineer | 1 hour of CPD on building on Tasmanian hazard land, recorded on your certificate for your registration or licensing body. |
CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.
Pairs well with.
Livable Housing Design (NCC Part H8): Getting It Right on Tasmanian Homes
Another Tasmanian house provision, clause by clause.
Fire Separation and Fire-Resisting Construction for Townhouses and Units
Separating walls, boundaries and small unit buildings, with the Tasmanian position.
How the NCC Actually Works: Structure, Responsibility & Compliance Pathways
Performance requirements, deemed-to-satisfy solutions and who decides.
Before you enrol.
Get your next Tasmanian hazard land job through approval first time, in one self-paced hour.
$99, 60 minutes, certificate on completion.