Your course

Pick up where you left off.

Current Status

Not Enrolled

Price

$99.00

Get Started

Course Content

I. Introduction (4 minutes)
II. Learning Objectives (1 minute)
VII. Case Studies (3 minutes)
VIII. Summary and Key Takeaways (2 minutes)
Final Quiz – External and Below-Ground Waterproofing (AS 4654)
For licensed waterproofers, membrane applicators and builders

External and Below-Ground Waterproofing (AS 4654)

On a balcony, podium or basement wall, a leak is a structural repair, and it carries your name.

Balconies, podiums, planters and basements, installed to AS 4654 and checked against the NCC 2025 Part F1 figures. What to measure on the slab before you open a tin, how to detail the edges and penetrations where external membranes fail, and how to protect and drain what is built over the membrane after the flood test. Then where the Standard stops below ground, and what to ask for before you price.

60 minutes, self-paced Intermediate level 1 formal CPD point Certificate on completion National, NCC 2025 and NCC 2022
Aligned to NSCA 2021 PC12 PC37 PC45 PC55 PC56
$99 inc. GST
  • Product neutral, no supplier content
  • Audio version and glossary included
  • Certificate saved to your dashboard

Secure card checkout. Tax invoice emailed.

Course content

4 modules, 2 case studies, final quiz and certificate.

Start 5 min

Introduction and objectives

Why an external leak is a structural repair rather than a callback, and the four things you will be able to do by the end.

Module 1 10 min

Falls, drainage and the substrate: getting the water away

Measure the fall, step-down, hob, overflow and joint layout before you price, and give the bed a way out at membrane level.

Module 2 10 min

Upstands, terminations, penetrations and movement

Terminate above the finished surface, sleeve every pipe and post, and build corners and joints so the membrane flexes instead of splitting.

Module 3 10 min

Balconies and podiums: the system over the membrane

Protect the membrane the day the flood test passes, send the sequence note, and tell a drained or bonded finish from a tank.

Module 4 10 min

Planters, roof gardens, below ground and the record

Know where AS 4654 stops, ask for the planter or tanking design in writing, and keep the record that decides whose repair it is.

Case studies 3 min

A balcony and a basement wall

A balcony that passed its flood test and failed the building, and a basement room that leaked from the wall and the planter above it.

Summary 2 min

Key takeaways

The five checks to take onto your next deck.

Finish

Final quiz and certificate

Ten site scenarios. Pass and the certificate goes straight into your dashboard.

Intermediate. For people who already install, supervise or inspect external membranes. Covers balconies, podiums, concrete roofs, planters and roof gardens under AS 4654 and NCC 2025 Part F1, and the questions to ask before tanking below ground. It does not teach below-ground tanking design, which comes from the engineer and the system manufacturer, and it is not legal or insurance advice. Internal wet areas are a separate course.

Who it is for

Written for the trades who put the membrane down and build over it.

Licensed waterproofers and membrane applicators

Your membrane passes its flood test, other trades build over it, and any leak below gets called a membrane failure.

1 hour of CPD, certificate on file

Licensed builders and site supervisors

You sequence the screeder, the tiler and the balustrade contractor over a membrane nobody can see once the bed goes down.

1 CPD point, state CPD

Tilers, pavers and landscape contractors

Your bed, pedestals and planters sit on the membrane, and they decide whether water can leave at membrane level.

1 hour of CPD

Building surveyors and certifiers

You see the slab before the membrane and the claim after it, and need to know what a compliant fall, outlet and hob look like.

1 CPD point

Architects and building designers

Your threshold, outlet, balustrade and planter details are the ones the installer has to build to, or write to you asking for.

1 formal CPD point for architects
How it counts

Where this hour goes on your record.

National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:

PC12

Building codes and standards

PC37

Documentation installers can check

PC45

Materials and performance standards

PC55

Document control during construction

PC56

Substitutions and late changes on site

If you are

How it is recorded

A licensed waterproofer or membrane applicator

1 hour of CPD on external and below-ground waterproofing to AS 4654. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard, so you can show what you studied if your licensing body or a head contractor asks.

An architect

1 formal CPD point. Aligned with NSCA 2021 performance criteria PC12, PC37, PC45, PC55 and PC56.

A builder, tiler, surveyor or building designer

1 hour of CPD on AS 4654 and NCC 2025 Part F1, recorded on your certificate for your registration body or state scheme.

CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.

  • Check falls, step-downs, hobs, overflows, exposed joints and the substrate against the NCC figures before any membrane goes down.
  • Provide for water to leave at membrane level as well as at the surface, with a flanged outlet, a weep and a bed or cavity that drains.
  • Detail upstands, terminations, penetrations, movement joints and changes of plane so the membrane stays continuous where it is stressed.
  • Protect the membrane the moment the flood test passes and issue the sequence note that assigns what happens on the deck next.
  • Build a drained, self-draining or bonded finish over the membrane on a balcony or podium and know which one you are actually looking at.
  • Recognise where planters, roof gardens and below-ground work leave AS 4654 behind, ask for the tanking or immersion design in writing, and keep the record that protects you.
Keep going

Pairs well with.

Waterproofing installers

Wet Area Waterproofing in Practice (AS 3740)

The inside of the building: showers, bathrooms and laundries to the wet area Standard.

Building designers

The Waterproofing Time Bomb: Defending High-Risk Balconies and Podiums

The same decks from the drawing board: what the balcony section has to show before the slab is poured.

Architects

Balcony Waterproofing Under NCC 2025: What Has Actually Changed (and What Hasn’t)

What NCC 2025 changed for balconies, and what it left alone.

Questions

Before you enrol.

Yes. AS 4654 Parts 1 and 2 are the membrane Standard called up under both NCC 2022 and NCC 2025. The fall, step-down, hob and overflow figures the course measures against are NCC 2025 Volume One Part F1, for Class 2 to 9 buildings. Victoria adopted NCC 2025 on 1 May 2026; Western Australia and the ACT commenced it the same day, with either edition available until 1 May 2027; New South Wales, Queensland, South Australia and Tasmania move to it on 1 May 2027, and the Northern Territory has set no date. The edition follows the building approval, so confirm it for each project.

Start, stop and finish later. Progress is saved and the course stays in your dashboard.

Yes, on passing the final quiz. It is stored in your dashboard alongside your other CPD records.

Up to the point where AS 4654 stops. Below ground is a designed system, so the course covers the four questions to ask before you price a basement or retaining wall, and what to ask the engineer or the system manufacturer for in writing. It does not give you a tanking design. Internal wet areas are covered in Wet Area Waterproofing in Practice (AS 3740).

Yes. Team packs start at $579 for six courses shared across your business.

No. Every course is product neutral. No membrane or drainage brands, no sponsor, no sales pitch at the end.

Measure the slab, drain the bed and keep the record, in one self-paced hour.

$99, 60 minutes, certificate on completion.

$99 1 hour, certificate