Your course

Pick up where you left off.

Current Status

Not Enrolled

Price

$99.00

Get Started

Course Content

I. Introduction (4 minutes)
II. Learning Objectives (1 minute)
III. Module 1: The Setout: Getting Water to the Drain (10 minutes)
VI. Module 4: Proving It and Protecting Yourself (11 minutes)
VII. Case Studies (3 minutes)
VIII. Summary and Key Takeaways (2 minutes)
Final Quiz – Wet Area Waterproofing in Practice (AS 3740)
For waterproofers, tilers and licensed builders

Wet Area Waterproofing in Practice (AS 3740)

Wet areas leak at the waste, the corners and the doorway, and the waterproofer gets the blame.

Falls, wastes, junctions, the membrane and the flood test before the tiler arrives. How to check the setout and the substrate against the Housing Provisions figures, detail the membrane at every junction, height and termination, and build and cure it to the data sheet. Then prove it with a flood test and keep the record that defends your work when a leak is blamed on the membrane.

60 minutes, self-paced Intermediate level 1 formal CPD point Certificate on completion National, NCC 2025 and NCC 2022
Aligned to NSCA 2021 PC12 PC37 PC45 PC55 PC56
$99 inc. GST
  • Product neutral, no supplier content
  • Audio version and glossary included
  • Certificate saved to your dashboard

Secure card checkout. Tax invoice emailed.

Course content

4 modules, 2 case studies, final quiz and certificate.

Start 5 min

Introduction and objectives

Why leaks start at wastes, junctions, penetrations and doorways, and why AS 3740 and Part 10.2 of the Housing Provisions carry the force of the Code.

Module 1 10 min

The Setout: Getting Water to the Drain

Check the 1:80 to 1:50 fall, the 25 mm set-down, the flanged waste, every penetration and the shower threshold before you open a tin.

Module 2 10 min

The Substrate: Prepare It, Prove It or Reject It

Read concrete, screed, sheet and timber floors for clean, sound, primed and dry, and reject an unfit one in writing.

Module 3 10 min

The Membrane: Junctions, Heights, Coats and Cure

Match the bond breaker to the membrane class, measure the 1800, 50, 25 and 5 mm heights, and cure to the data sheet, not the clock.

Module 4 11 min

Proving It and Protecting Yourself

Run a flood test before the tiler, hand over in writing, and keep the folder that answers a claim years after you were paid.

Case studies 3 min

A reused waste and a wet screed

A waste with no flange that leaked for eighteen months, and a wet screed refused in one email that kept a waterproofer out of a claim.

Summary 2 min

Key takeaways

The habits to take onto your next shower, ensuite or laundry.

Finish

Final quiz and certificate

Ten scenario questions, each a decision from a real bathroom. Pass and the certificate goes straight into your dashboard.

Intermediate. For people who already install, prepare for or inspect membranes in domestic wet areas. Covers showers, bathrooms, ensuites and laundries under AS 3740:2021 and Part 10.2 of the ABCB Housing Provisions, from the setout to the handover. It does not cover external or below-ground waterproofing, and it is general education, not legal or insurance advice.

Who it is for

Written for everyone whose work sits on, under or through the membrane.

Licensed waterproofers

When a shower leaks you are the first name in the email, whoever else worked on that floor.

1 hour of CPD, on your certificate

Wall and floor tilers

You work straight onto the membrane, and a knock, a grind or a trowel through it is hidden the moment you tile.

1 hour of CPD

Licensed builders

You set the falls and the programme, and pushing a green screed to suit the tiler is a claim waiting to happen.

1 CPD point, state CPD

Plumbers and drainers

The waste, its flange and every tap and spout penetration are yours, and that is where the water gets in.

1 hour of CPD

Building surveyors

You check falls, hobs, waterstops and the livable bathroom before the tiles hide them.

1 CPD point
How it counts

Where this hour goes on your record.

National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:

PC12

Building codes and standards

PC37

Documenting wet area details

PC45

Materials and performance standards

PC55

Document control during construction

PC56

Substitutions and late penetrations

If you are

How it is recorded

A licensed waterproofer

1 hour of CPD on AS 3740:2021 and Part 10.2 of the ABCB Housing Provisions. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard for your licence or registration records.

An architect

1 formal CPD point. Aligned with NSCA 2021 performance criteria PC12, PC37, PC45, PC55 and PC56.

A builder, tiler, plumber or surveyor

1 hour of CPD on wet area waterproofing, recorded on your certificate for your registration body or state scheme.

CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.

  • Check falls, set-downs, wastes, flanges and shower thresholds against the Housing Provisions figures before any membrane goes down.
  • Identify what concrete, screed, fibre cement, water resistant plasterboard and timber based floors each do under a bonded membrane, and what clean, sound, primed and dry mean for each.
  • Write a short refusal that states the reading, quotes the requirement and names the fix when a substrate is not fit to coat.
  • Select the bond breaker for the class of membrane and detail the 1800, 50, 25 and 5 millimetre heights and terminations at every junction, hob, doorway and screen line.
  • Build and cure the membrane to the data sheet, terminate it at or in the drainage flange, and record coverage, batch numbers, temperature and time per coat.
  • Run a flood test after full cure and before the tiler, hand over in writing with the rule on later penetrations, and keep the record that defends the work.
Keep going

Pairs well with.

Waterproofing installers

External and Below-Ground Waterproofing (AS 4654)

The same trade outside the building, from the roof down to below ground.

Builders and designers

Livable Housing Design: NCC Mandatory Provisions (NCC 2022) with NCC 2025 Preview Context

The rule behind the hobless, step-free shower in the livable bathroom.

Builders and designers

Construction Waterproofing 101: Avoiding Common Mistakes

The wet area numbers from the drawing side, for the people who document them.

Questions

Before you enrol.

Yes. AS 3740:2021 is the edition called up by both NCC 2022 and NCC 2025, and the wet area provisions read the same in both. Licensing, warranties and the livable bathroom rule differ by state, and the course flags each one to confirm for your job.

Start, stop and finish later. Progress is saved and the course stays in your dashboard.

Yes, on passing the final quiz. It is stored in your dashboard alongside your other CPD records.

No. This course covers internal wet areas: showers, bathrooms, ensuites and laundries. External and below-ground work under AS 4654 is covered in External and Below-Ground Waterproofing (AS 4654).

Yes. Team packs start at $579 for six courses shared across your business.

No. Every course is product neutral. No membrane brands, no sponsor, no sales pitch at the end.

Get the membrane right and proven before the tiler arrives, in one self-paced hour.

$99, 60 minutes, certificate on completion.

$99 1 hour, certificate