Your course

Pick up where you left off.

Current Status

Not Enrolled

Price

$99.00

Get Started

Course Content

I. Introduction (2 min)
II. Learning Objectives (1 min)
III. Module 1: Which Code, Which Volume, Which Project (9 min)
IV. Module 2: Wet Areas: The Numbers You Have to Draw (11 min)
V. Module 3: Junctions, Thresholds and the World Outside (10 min)
VI. Module 4: The Drawings, the Evidence and the Record (10 min)
VII. Case Studies (4 min)
VIII. Summary & Key Takeaways (1 min)
For builders, project managers and building surveyors

Construction Waterproofing 101: Avoiding Common Mistakes

Waterproofing defects start on the drawing, months before anyone opens a bucket of membrane.

Which code applies, and what your drawings have to show. How to confirm the NCC edition, volume and pathway for each project, the wet area dimensions and extents to draw rather than note, the junctions and thresholds where systems fail, what NCC 2025 changed at the balcony threshold, and the record that shows who decided what.

60 minutes, self-paced Foundational level 1 formal CPD point Certificate on completion National, NCC 2022 and NCC 2025
Aligned to NSCA 2021 PC12 PC39 PC45 PC55 PC56
$99 inc. GST
  • Product neutral, no supplier content
  • Audio version and glossary included
  • Certificate saved to your dashboard

Secure card checkout. Tax invoice emailed.

Course content

4 modules, 2 case studies, final quiz and certificate.

Start 3 min

Introduction and objectives

Why a waterproofing defect outlasts your involvement, and why two editions of the code are live at once.

Module 1 9 min

Which Code, Which Volume, Which Project

Settle the edition, the volume and the compliance pathway before you draw, and see why a house and an apartment follow different documents.

Module 2 11 min

Wet Areas: The Numbers You Have to Draw

Draw the shower area, the timber floor rule, falls, step downs, hobs and level thresholds as dimensions, not as a note.

Module 3 10 min

Junctions, Thresholds and the World Outside

Detail junctions, flashings and penetrations, and apply the NCC 2025 step down, fall and hob at a balcony threshold.

Module 4 10 min

The Drawings, the Evidence and the Record

Know what a waterproofing drawing must show, control substitutions, and keep the record that answers the question years later.

Case studies 4 min

A threshold and the wrong volume

A flush balcony threshold that was never detailed, and a house bathroom detail reused on a Class 2 walk up.

Summary 1 min

Key takeaways

Three questions at setup, dimensions on the drawing, and the record that protects you later.

Finish

Final quiz and certificate

Ten project scenarios across the four learning objectives. Pass and the certificate goes straight into your dashboard.

Foundational. For people who document, build or approve wet areas and external waterproofing on houses and apartments. Covers the edition, volume and pathway question, wet area dimensions under the Housing Provisions and AS 3740, junctions and thresholds, the NCC 2025 balcony provisions, evidence of suitability and the coordination record. It does not qualify you to certify or install a membrane.

Who it is for

Written for everyone whose name can end up on a waterproofing claim.

Builders

You build to the drawings and sign off the substitutions that can quietly break compliance.

1 hour of CPD

Project managers

You carry the programme when a certifier asks which provisions the wet areas were designed to.

1 hour of CPD

Building surveyors

You assess wet area and balcony details drawn from the wrong volume or carried over from NCC 2022.

1 hour of CPD

Architects

You coordinate the levels, falls and membrane standard across the structural and hydraulic drawings.

1 formal CPD point

Building designers

You set the extent, the levels and the standard, and a dispute years later reconstructs what your detail showed.

1 CPD point, with audit-ready records
How it counts

Where this hour goes on your record.

National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:

PC12

Advice under building codes and standards

PC39

Materials and construction systems in documentation

PC45

Performance standards for materials and systems

PC55

Record keeping and document control in construction

PC56

Defects, rectification and substitutions

If you are

How it is recorded

A building designer

1 CPD point. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard, so you can show what you studied if your CPD is audited.

An architect

1 formal CPD point. Aligned with NSCA 2021 performance criteria PC12, PC39, PC45, PC55 and PC56.

A builder, project manager or building surveyor

1 hour of CPD on waterproofing under NCC 2022 and NCC 2025, recorded on your certificate for your registration body or state scheme.

CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.

  • Identify the NCC edition, volume and provisions that govern waterproofing on a given project.
  • Distinguish the Class 1 Housing Provisions route from the Class 2 to 9 route through Specification 26 and AS 3740.
  • Apply the wet area waterproofing dimensions, extents, falls and thresholds to a documented bathroom.
  • Analyse the junction, penetration and threshold interfaces where waterproofing systems fail.
  • Apply the NCC 2025 step down, substrate fall and hob requirements to a balcony threshold where NCC 2025 governs.
  • Produce the drawings, evidence of suitability and coordination record that establish who carried each decision.
Keep going

Pairs well with.

Building designers

The Waterproofing Time Bomb: Defending High-Risk Balconies and Podiums

The next step outside: NCC 2025 balconies, podiums and concrete roofs in detail.

Building designers

Non-Conforming Building Products: Specification Risk, Evidence of Suitability, and Documentation Defence for Building Designers

Evidence of suitability and the substitutions that quietly break a specification.

Building designers

The Breathable Wall: Understanding Condensation Risks in NCC 2025

The other half of keeping water out: vapour, cavities and membranes in the wall.

Questions

Before you enrol.

Both. Most wet area provisions are the same in NCC 2022 and NCC 2025, and the course flags what changed, mainly at the balcony threshold. NCC 2025 is in force in Victoria. Western Australia and the ACT allow either edition until 1 May 2027, although in the ACT a building approval issued after 1 November 2026 must be under NCC 2025 unless the development application was lodged first. New South Wales, Queensland, South Australia and Tasmania stay on NCC 2022 until 1 May 2027, and the Northern Territory has not adopted NCC 2025. Confirm the edition for each project with your state or territory building authority.

Start, stop and finish later. Progress is saved and the course stays in your dashboard.

Yes, on passing the final quiz. It is stored in your dashboard alongside your other CPD records.

No. It covers the design decisions and their documentation: which provisions apply, the dimensions to draw, the interfaces to detail and the record to keep. Installation workmanship and inspection stay with the builder and the waterproofer.

Yes. Team packs start at $579 for six courses shared across your practice.

No. Every course is product neutral. No membrane brands, no sponsor, no sales pitch at the end.

Put the waterproofing decisions on the drawing, where they can be defended, in one self-paced hour.

$99, 60 minutes, certificate on completion.

$99 1 hour, certificate