Pick up where you left off.
Course Content
Fire and Combustibility for Cladding Installers
When the panel on the wall is not the panel on the certificate, your name is on the docket.
Which external walls must be non-combustible, what that word means as a laboratory test rather than a look, and which documents prove a panel passed it. How a substitution breaks compliance without anyone noticing, what to put in writing before the pallet is opened, and how to install and photograph the certified system so its rating survives an audit years later.
Secure card checkout. Tax invoice emailed.
4 modules, 2 case studies, final quiz and certificate.
Introduction and objectives
Why a combustible facade bypasses every fire measure inside the building, and why the installer now sits inside the chain of responsibility.
What Non-Combustible Means and Where It Applies
Read Type A or B off the class and rise in storeys, tell an AS 1530.1 result from early fire hazard indices, and know the short list of what may be combustible.
The Certified System, Not the Look-Alike
Check a test report against the panel, core, framing, insulation and sarking, and run the four-way match on delivery day.
Substitution and Your Exposure
Answer an offered or delivered substitute in writing, stop the affected work until the certifier confirms, and record what you fitted on whose instruction.
Installing So the Rating Is Preserved
Fix every layer mechanically, check cavity barriers, junctions and penetrations against the system, and photograph each elevation before cover.
One installer protected, one exposed
Two facades picked up in state audits: one cleared from the installer’s folders, one ordered off the building with the installer named.
Key takeaways
The five habits to take to your next facade, from reading the drawings to signing only for what you fitted.
Final quiz and certificate
Ten scenario questions from real facade decisions. Pass and the certificate goes straight into your dashboard.
Intermediate. For people who install, supervise, supply or certify external walls on Class 2 to 9 buildings. Covers the non-combustible external wall provisions of NCC Volume One, evidence of suitability, substitution and installing to the tested system, with state cladding bans and duties stated by state. It does not cover fire engineering, the choice of construction type or performance solutions, which belong to the designer, the fire engineer and the certifier, and it is not legal or insurance advice.
Written for everyone between the specification and the finished facade.
Cladding and facade installers
You fit what is delivered, and years later an audit sample decides whether it was the product on the certificate.
Licensed builders and site supervisors
A buyer’s cheaper equal or a signed site instruction is where a certified facade quietly stops being one.
Building surveyors and certifiers
You accept a product on its evidence, and every inspection after that assumes it is what went on the wall.
Architects and facade designers
Only you and the certifier can accept a substitution, and the installer’s written note is how it reaches you.
Building product suppliers and estimators
A sister panel or a cheaper equal usually starts with you, and in Queensland so do chain of responsibility duties.
Where this hour goes on your record.
National Standard of Competency for Architects (NSCA 2021) performance criteria this course aligns with:
NCC fire provisions and standards
Liability exposure and risk mitigation
Materials and performance standards
Construction phase records
Substitution control and rectification
| If you are | How it is recorded |
|---|---|
| A cladding or facade installer | 1 hour of CPD on the NCC non-combustible external wall provisions, evidence of suitability and installation records. Your certificate, the learning outcomes, the module outline and your quiz result are kept in your dashboard for your licence or employer records. |
| An architect | 1 formal CPD point. Aligned with NSCA 2021 performance criteria PC12, PC16, PC45, PC55 and PC56. |
| A builder, site supervisor or certifier | 1 hour of CPD on the NCC Volume One fire provisions for external walls, recorded on your certificate for your registration body or state scheme. |
CPD On Demand is not a registered training organisation and courses are not accredited by any registration body. Each course is aligned with the relevant competency frameworks and gives you the records to evidence it. CPD rules differ by registration body and state, so check with yours if you are unsure.
Pairs well with.
Non-Conforming Building Products: Specification Risk, Evidence of Suitability, and Documentation Defence for Building Designers
Evidence of suitability and substitution, from the specifier’s side of the same chain.
Fire Safety in Residential Design: Understanding Passive and Active Systems for Design Documentation and Coordination
Passive and active fire systems, fire stopping and penetrations, coordinated with the fire engineer and certifier.
How the NCC Actually Works: Structure, Responsibility & Compliance Pathways
Deemed-to-Satisfy, Verification Methods and Performance Solutions, and who is responsible for each.
Before you enrol.
Fit the certified system, and keep the record that proves it, in one self-paced hour.
$99, 60 minutes, certificate on completion.